63 plans (Roppongi-3 Plan)
2000
It was thought that it was important that this plan pay attention to the characteristic in an existing building in the construction item of reconstruction work.
"Existing building" should be considered to be "Site" in the newly-built construction. There is big bind there, and is a clue that picks up the situation.
It can be judged that an existing building appears from three "Respect composition" "Two facades" generated by the limitation of "External terrace" and the road slash.
Then, it was thought that it was important to pay attention to this "Respect composition" that existing construction kept secret, and to lead this possibility in it was a positive direction.
- Scale/Structure
- Lot area
- Positive floor space
The second floor on the ground one floor in underground
165㎡
94.25㎡